Freelance work and personal explorations

In this gallery you will find a collection of freelance and personal projects ranging from packaging design, to visual communication, to web design, and more.
A product photography shot of six Bodrato gianduja spread jars arranged on a white surface, with copper lids and varied label colors — red, cream, dark brown, and green — labeled Classica, Intensa, Chiara, Forte, and Pistacchio. Scattered around them are cacao beans, hazelnuts, ground cacao powder, and pistachios, with a wooden spoon dripping chocolate spread in the foreground.
Chocolate cream labels for Bodrato Cioccolato, final product | 2025
A flat-lay product shot of multiple open spreads of the Citizen Voice print portfolio, fanned out diagonally across a deep red background. Visible spreads include a chapter opener for "Citizens meet Climate," team pages with portrait photos, a project timeline, and a "What is Citizen Voice?" introduction page.
Portfolio book for Citizen Voice | 2025
 Two desktop website mockups of the Citizen Voice website on a light blue background. The left mockup shows the homepage with a projects section featuring Citizens meet Climate, BIO-CiVo, and ParticipaIte, plus tools and news sections. The right mockup shows the team page with a grid of black-and-white portrait photos and names of contributors.
Website for the research team Citizen Voice | 2025
Two visitors — a woman and a man — sit on a decorative bench inside a dimly lit installation space. Behind them is a large-scale mural photograph of a Dutch canal street. A sign to their right reads "Sit down and say hello!" and a monitor plays video in the background.
Bruno the Bench installation | Dutch Design Week 2023
A 3D product render of three Bodrato chocolate spread jars against a gray background. From left to right: a green-labeled pistachio cream jar, a dark brown-labeled Forte jar with a band wrap showing illustrated cacao pods, and a red-labeled Classica jar with illustrated hazelnuts, all with copper lids and the Bodrato logo medallion.
Render of design proposals for Bodrato Cioccolato | 2025
Three dark-themed mobile screens for a fictional moon robot management app. The home screen shows a map of the moon with robot positions and a status list. The "Monitor hexabot" screen shows a detailed view of a robot named Stark with its current and upcoming tasks. The "Assign a new task" screen shows a robot named Luna with selectable task presets and a location field.
Robot control app design | Designflows 2025
Three vertical desktop website screenshots for Studio De Lotto, an Italian architecture firm, displayed against a gray background. The left mockup shows the about page with team photos and studio history. The center mockup shows a projects grid with thumbnail images of residential buildings. The right mockup shows a detailed project page for the Masterplan Lungomare Riccardo Riva with architectural renders and a site map.
Website for the architecture firm Studio de Lotto | 2025
A person's hands hold open a small illustrated instruction booklet in front of a yellow Geldmaat ATM machine. The open page shows a step-by-step diagram with text reading "Voer uw PIN-code in, druk dan op OK" alongside an illustration of a hand pressing a keypad.
Instruction booklet design for Geldmaat | 2024
Three cylindrical Bodrato "Cremino al Sale" chocolate eggs tubes in two sizes, featuring a nautical illustrated label with a sailboat, ocean waves, and a dark chocolate egg emerging from the sea. A small standalone tube and four blue foil-wrapped chocolate eggs are arranged to the right.
Easter eggs packaging design for Bodrato Cioccolato | 2025
Three mobile app screens for a group travel planning app. The home screen shows current and upcoming trips including Lisbon, Japan, and the French Alps. The center screen shows a group poll asking "Where do you want to eat dinner?" with a restaurant option and a confirm vote button. The right screen shows the Lisbon trip timeline with color-coded activities, a poll result, and travel logistics.
Travel app UI exercise | 2025
A cream-colored canvas tote bag printed with a repeating pattern of the Citizen Voice logo mark and the words "Citizen Voice," laid flat on a wooden floor alongside a matching notebook and a set of stickers following the same motif.
Merch design for Citizen Voice | 2025